Demolition and New Construction of Staff Residence Thoraxklinik Heidelberg
Building automation: 1 BACnet automation station for connection to the existing building management system, 1 freely programmable DDC system controller with 18 I/O, approx. 10 I/O and expansion modules for DDC automation, approx. 16 temperature sensors including immersion sleeves, approx. 5 control/mixing valves DN 15–50, approx. 4 electric valve actuators, 1 local 10" touch display for system operation, approx. 24 field devices or field device connections, 1 ready-to-operate MSR control cabinet (approx. 800 × 1,800 × 500 mm), programming and parameterization of DDC automation, approx. 20 data point/device tests during commissioning, connection and integration of building automation via BACnet/IP or BACnet MS/TP into the existing JCI building management system.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 658921-2026HTML
- TED PDF — 658921-2026PDF
- TED XML — 658921-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.