Demolition and dismantling work for the roof structure at Mülheim Hbf
Demolition and dismantling work for the existing roof's steel structure at Mülheim Central Station: dismantling of the distribution level in two construction phases, including floor, wall, and ceiling constructions, window and door systems, technical building equipment, cable systems, and ventilation systems. Professional dismantling and disposal of all components, including substructures and fasteners. Phased dismantling of the existing roof, including roof waterproofing, concrete slabs, and steel structure according to the demolition concept. Work will be carried out in two construction phases during ongoing operations. Creation of a demolition and disposal plan based on the demolition concept. Execution time approximately 12 months, starting in October 2026.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45111100, Demolition work.
ADDITIONAL DETAILS
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
7 days remaining(LOT-0001)
Published