Demolition works for pipeline bridge Holbeinstraße - Uferstraße in Plauen
Demolition of the pipeline bridge over Holbeinstraße, Weiße Elster, Uferstraße, and Am Mühlgraben street: includes two superstructures and three steel support structures, as well as three concrete foundations. The superstructures are approximately 44 m and 50 m long, located about 5-6 m above the roadway, and each weigh approximately 20-25 t. The support structures weigh a total of approximately 5 t. Demolition is to be carried out by lifting out the superstructures, which are partially located under high-voltage overhead lines. The lifting must be performed simultaneously with at least three mobile cranes. Works are partly planned for evening and night hours. Completion of services by 23.10.2026, with a possible start of execution on 19.10.2026.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25709112NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.