Extension and Reconstruction of Chrudim Sports Hall, Phases II and III
Construction works for the extension and reconstruction of Chrudim Sports Hall, Phases II and III: new construction of a Sporthotel and a connecting corridor, reconstruction of Tyrš House, new construction of a multi-storey car park, structural modifications to the sports hall. Also included is the construction of adjacent paved areas, connections, internal utility lines, and landscaping. The services comprise the following construction and engineering objects: SO 2.2.3.4.1 Tyrš House, SO 2.2.0.4.2 Sporthotel, SO 2.2.0.4.3 Gymnasium, SO 2.2.0.4.4 Multi-storey car park, SO 2.2.0.4.5 Sports hall, SO 2.0.3.1.6 Paved areas, SO 2.0.7.4.7 Landscaping, IO 2.0.6.4.1 Area sewage system, IO 2.0.6.4.2 Area rainwater drainage, IO 2.0.6.4.3 Water connection, IO 2.0.6.4.4 Sewage connection, IO 2.0.6.4.5 Oil separator, IO 2.0.6.4.6 Grease separator, IO 2.0.6.4.8 Area low voltage lines, IO 2.0.6.4.10 Public lighting; further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 536590-2026HTML
- TED PDF — 536590-2026PDF
- TED XML — 536590-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.