Connection of Trier-Ehrang Wastewater Treatment Plant to Trier Main Wastewater Treatment Plant
Civil engineering and structural works for the connection of the Trier-Ehrang wastewater treatment plant to the Trier main wastewater treatment plant: excavation for trenches and structures: approx. 2,200 m³; PE pipes SDR 11, DN/OD 400: approx. 36 m; PE pipes SDR 11, DN/OD 250: approx. 32 m; PE pipes SDR 17, DN/OD 400: approx. 15 m; PE pipes SDR 17, DN/OD 140: approx. 10 m; PE pipes SDR 17, DN/OD 90: approx. 55 m; PE pipes SDR 17, DN/OD 40: approx. 70 m; PVC protective pipe AD 160 and 110: approx. 440 m; overlapping bored pile wall DN900: approx. 760 m; drilling: approx. 640 m; concrete/reinforced concrete structures: approx. 270 m³; formwork for structures: approx. 1,000 m²; precast reinforced concrete shafts: 2 units, including associated ancillary services.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 542812-2026HTML
- TED PDF — 542812-2026PDF
- TED XML — 542812-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.