Activeted-469943-2026

Cutting work for 1kV overhead line network

Cutting work for the 1kV overhead line network in the SWM supply area, including the Regio Netz, based on planning documents. Total scope: 275 km, divided into two lots.

CONTRACTING AUTHORITY

Name

SWM Infrastruktur GmbH & Co. KG

City

München

Country

DE

CLASSIFICATION

Procedure Type

neg-w-call

Contract Type

Services

Main CPV

77340000, Tree pruning and hedge trimming.

LOTS (2)

LOT-0001Services

Ausschneidearbeiten für 1kV-Freileitungsnetz, Los 1

LOT-0002Services

Ausschneidearbeiten für 1kV-Freileitungsnetz, Los 2

ADDITIONAL DETAILS

Suitable for SMEs

Yes

Electronic Submission

allowed

Legal Basis

32014L0025

DEADLINES & TIMELINE

Submission Deadline

28 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

28 days remaining

Similar Tenders

Explore CPV 77

Design and structural planning for 110kV cable crossing in Munich

Object planning and structural design for the new construction of the 110kV line 120 MZ-HAD, specifically for the crossing of the Würm and Fabrikbach watercourses in Pasinger Stadtpark at the height of Avenariusstraße. The measure includes a trenchless watercourse crossing with a length of approx. 125 m for laying steel product pipes DN200 as well as PE-RT and PP cable protection pipes. In addition, structural design for the associated launch and reception pits must be provided. The engineering planning trade dominates the procedure.

SWM Infrastruktur GmbH & Co. KG

·München
Deadline:July 27, 2026

110 kV Cable Construction for Munich Substations

Production, delivery, and installation of 110 kV PE single-core and three-core cables including optical fibers and associated accessories for three cable construction projects in Munich. The measure includes cable pulling, installation of terminations and jointing sleeves, as well as dismantling of existing systems in the Thalkirchen substation, Kistlerhofstraße substation, and Menzing main substation. Key quantities include, among others, 3215 m of 110 kV urban cable and 1025 m of 110 kV single-core cable. The cable construction/high-voltage work sector dominates the execution.

SWM Infrastruktur GmbH & Co. KG

·München
Deadline:July 27, 2026

110 kV Cable Laying for Pasing Substation

Delivery and laying of 110-kV high-voltage cables within the scope of the Pasing substation - Convoy 3 project in Munich. The construction measure includes the cable construction for three transformers for the old substation system during ongoing operation. The main services include material delivery and cable pulling of 400 m of 110-kV XLPE single-core cable N2XS(FL)2Y 1x300RM/50 as well as the assembly of cable accessories and terminations. The cable construction trade or cable assembly dominates the procedure.

SWM Infrastruktur GmbH & Co. KG

·München
Deadline:July 23, 2026

LiDAR Survey for Replacement of Power Lines

Performance of an airborne LiDAR and imagery survey for the inventory for the planned replacement construction of the 110 kV overhead power line between the Uppenborn I substation and the Föhring main substation, including the Moosburg branch. The project area covers a total area of approx. 2,200 ha and a route length of approx. 49.5 km with 259 lattice towers. The main services include flight planning, LiDAR data acquisition, orthophoto creation, and oblique imagery of all towers. The dominant trade is above-ground surveying and aerial photography documentation.

SWM Infrastruktur GmbH & Co. KG

·München
Deadline:July 16, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now