Outdoor Facilities for the Haus des Gastes Oybin
Outdoor facilities work for the Haus des Gastes Oybin: Construction of a 60 m long pipeline trench (0.70 cm deep), laying of 20 m PVC pipe DN 150, installation of 1 shaft DN 150, placement of 16 existing granite columns as a pergola in socket foundations, creation of 40 m² gravel sub-base and laying of ecological concrete paving, creation of 10 m² gravel sub-base and laying of rectangular concrete paving. The service also includes the delivery and installation of 3 bicycle stands, 3 waste bins, 3 benches, 1 drinking fountain, and 2 stands with 4 signposts for the local wayfinding system. Execution period: October to December 2026.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25681208NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.