Outdoor facilities for the new construction of a two-stream primary school with after-school care and single-field sports hall
Outdoor facilities for the new construction of a two-stream primary school with after-school care and single-field sports hall: terrain regulation, soil removal and re-installation of 2,660 m³; soil application with delivery of 1,285 m³; creation of 3,300 m² embankments; creation of paths and traffic areas of load class 1.0 (475 m²) and load class 0.3 (895 m²); 2,980 m² walkways and plaza areas; play areas with 150 m² fall protection panels, 650 m² wood chips, and a sand play area; stairs with handrails (2 stairs 6 steps 15/35/250, 5 stairs 6 steps 15/35/150, 1 stair 4 steps 15/35/150, 1 stair 8 steps 15/35/150, 2 stairs 8 steps 15/35/250, 1 stair 9 steps 15/35/350, 2 stairs 6 steps 15/35/200); a stepped seating area of 45 m²; 20 m concrete angle retaining walls up to 155 cm construction height; surface drainage with 185 m facade gutters, 35 m drainage gutters, 17 floor drains, and 250 m pipes; sports facility with 970 m² small playing field (seamless fall protection surfacing), 25 m² long jump facility, 135 m ball catch fence, and 300 m drainage; metalwork for 64 m fall protection and a play and evacuation slide; equipment including 3 equipment sheds, 18 m privacy screen, benches, seating groups, waste collectors, play equipment, sun sails, and parasols; earth and foundation work for 15 mast and bollard lights; fence construction with 365 m bar grating fence and 3 swing gates; landscaping works include 57 tree plantings, 535 m² planting areas, 1,590 m² free-growing shrub areas, 240 m² perennial mixed planting, and 3,760 m² lawn seeding, including completion and development care.
CONTRACTING AUTHORITY
Name
Gemeinde Neukirchen im Erzgebirge
City
Neukirchen / Erzgebirge
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45214210, Primary school construction work.
Other CPV
45112710, Landscaping work for green areas.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
30 days remaining(LOT-0001)
Published