Skip to main content
Activeted-477579-2026

Motorway Construction D55, Napajedla - Babice Section

Construction of a new permanent, directionally separated four-lane motorway with limited access in section D55 5506, category D 25.5/130.

CZK 9,211,574,000
View original source

CONTRACTING AUTHORITY

Name

Ředitelství silnic a dálnic s. p.

City

Praha

Country

CZ

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45233110, Motorway construction works.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

62 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

62 days remaining

Similar Tenders

Explore CPV 45
CZK 3.2M

Support Services for Fortinet Solutions

Support Services for Fortinet Technologies: Provision of support, service services, and security updates for existing Fortinet technologies, including renewal and expansion of FortiCare Premium/Elite and security services such as UTP, Enterprise Protection, and Sandbox Threat Intelligence.

Ředitelství silnic a dálnic s. p.

·Praha
Deadline:August 17, 2026
CZK 6.5M

Road Weather Station and Variable Message Signs for Road I/20 Kasejovice

Construction of a Road Weather Station (SMS) and two variable message signs (PDZ), controlled by the road weather station, on Road I/20 near Kasejovice.

Ředitelství silnic a dálnic s. p.

·Praha
Deadline:August 18, 2026
CZK 877.1M

Construction and Operation of a Charging Park for Heavy Electric Vehicles at D1 Osek nad Bečvou Rest Area

Charging park for heavy electric vehicles at the D1 Osek nad Bečvou motorway rest area (km 289.3 left): Preparation of project documentation, complete engineering activities for obtaining permits for construction modifications and the placement of charging stations and other approved objects, obtaining the associated occupancy permit, full realization of construction works and installation of charging stations within the charging park to meet the minimum requirements of Art. 4 Para. 1 lit. b) Point i) of the AFIR Regulation. Capacity expansion of charging stations by December 31, 2030, to meet the minimum requirements of Art. 4 Para. 1 lit. c) of the AFIR Regulation. Operation of the charging park for heavy electric vehicles with a maximum permissible weight exceeding 3.5 tons. Removal of charging stations after contract fulfillment or their sale to the contracting authority.

Ředitelství silnic a dálnic s. p.

·Praha
Deadline:August 20, 2026
CZK 3.2B

Road construction for the I/55 Břeclav bypass

Road construction: Removal of traffic deficiencies on the exposed Class I road within the built-up area of Břeclav, including the connecting section of road I/40 through Poštorná. The technical parameters of the existing through sections do not meet the requirements for safe, smooth, and high-capacity transfer of increasing transit traffic intensities from the D2 motorway towards the Czech-Austrian state border. The new routing is designed outside built-up areas, mainly over agricultural land, to reduce negative environmental impacts from traffic on residential areas.

Ředitelství silnic a dálnic s. p.

·Praha
Deadline:July 31, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now