Construction of Chmielnik bypass
Construction of a bypass for Chmielnik in the Świętokrzyskie Voivodeship, Kielce County: The investment starts at km 4+300 of national road No. 78 (approx. km 227+975) and ends at approx. km 43+600 of national road No. 73. The scope includes the construction of a section of a main accelerated traffic road (GP class) on a new alignment, the construction of 2 engineering structures (1 small animal underpass PZM-10 with approx. 17m length, approx. 1.5m horizontal clearance, relative tightness coefficient ≥ 0.09; 1 small animal underpass PZDs-11 with approx. 17m length, approx. 6.0m horizontal clearance, approx. 3.5m vertical clearance, relative tightness coefficient ≥ 1.25), the reconstruction of existing roads crossing the new main accelerated traffic road, the construction of additional lanes/other public roads for servicing adjacent areas, the construction of traffic safety devices, sidewalks, a drainage system including retention-evaporation tanks, 1 vehicle inspection and weighing station, and the construction and reconstruction of technical infrastructure related and unrelated to the road, including technological channels. A Traffic Management System is also included, covering technological channels, a traffic management system concept, detour management, and meteorological data acquisition. The estimated contract value is above 20 million Euro.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 601878-2026HTML
- TED PDF — 601878-2026PDF
- TED XML — 601878-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.