Skip to main content
Activeted-533204-2026

Construction of the left embankment of the Biała River, km 6+600-8+345, Koszyce settlement, Tarnów – Phase III construction works

Construction of a left-bank flood protection embankment on the Biała River in the Koszyce settlement: erection of an earth embankment and a reinforced concrete boulevard/wall, including functionally related flood protection structures. The earth embankment has a height of up to 5.5 m, a total length of 1,357 m, and a crown width of 4.0 m. A slope bench is planned in the section km 1+270 – 1+690. The water-side slope will be reinforced with bio-nonwoven fabric on 15 cm fertile soil and 5 cm humus, or with 30 cm thick mesh-stone mattresses on geotextile. The air-side slope will be reinforced by humification and grass seeding, or with 30 cm thick mesh-stone mattresses on geotextile. The embankment body will be sealed with a geomembrane on the water-side slope, and the subsoil with a 4.5 m deep cement-bentonite diaphragm (CDMM technology) or by jet-grouting (where utilities/culverts are present). An animal protection net made of galvanized steel wire (min. 2.5 mm diameter, 5x5 cm mesh) will be installed on the water-side slope, fixed with min. 30 cm long steel pins. The boulevard/wall is a monolithic reinforced concrete structure with expansion joints and stone cladding, total length 346 m. Included are 3 dry culverts (600 mm diameter pipelines) with precast reinforced concrete docks, 20 cm thick stone riprap for ground reinforcement, a rare grate at the inlet, and a check valve at the outlet. One road ditch reconstruction with culvert and reinforcements, one partial liquidation of a ditch bed and a new ditch section with an embankment culvert. Three embankment crossings (3.0 m wide road plates + 2x0.5 m shoulders, except for km 1+695 with asphalt concrete surface), 6 maneuvering areas, 1,275 m of technological roads (3 cm gravel surface on a 15 cm geogrid base filled with gravel on geotextile, 3.0 m road width between concrete curbs), slope stairs at 8 locations (precast elements adapted to embankment slope) and the removal of stairs at 2 locations. Linear drainage at the air-side slope along the embankment and boulevard using concrete channels and stone drainage with outlets. The river bank of the Biała will be reinforced in two sections: Section 1 (near Krakow Street bridge) with 80-100 cm heavy stone riprap on a 30 cm fascine lining and toe protection by wooden piles (15 cm diameter, 200 cm long), slope height 2-3 m. Section 2 (along the reinforced concrete boulevard) with 30 cm thick mesh-stone mattresses on geotextile, stabilized with wooden piles (10 cm diameter, 100 cm long), slope height 4-7 m. Another partial liquidation of a ditch bed and a new ditch section with an embankment culvert (1 unit at km 0+568 / river km 7+187) with an 800 mm diameter pipeline, precast reinforced concrete docks, 30 cm thick stone riprap on geotextile, wooden pile palisade, a rare grate at the inlet, and a check valve at the outlet. A road ditch reconstruction at km 1+697 of the embankment by constructing culvert No. 4 (600 mm diameter pipeline) with stone-paved inlet and outlet and a flanged check valve at the outlet. Additionally, environmental supervision is required, including monitoring before construction begins for protected plant and animal species and their habitats in the riverbed and flood zone. further items as per the tender documents.

CONTRACTING AUTHORITY

Name

Państwowe Gospodarstwo Wodne Wody Polskie

City

Warszawa

Country

PL

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45246000, River regulation and flood control works.

Other CPV

45100000, Site preparation work.

45200000, Works for complete or part construction and civil engineering work.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

30 days remaining

Similar Tenders

Explore CPV 45

Technical inspection and testing of hydraulic structures for the Stargard Water Management Board

Technical inspection and testing of selected hydraulic structures: periodic control of their technical condition and suitability for use, further details as per the tender documents.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:September 01, 2026

Delivery of Tools and Power Tools with Accessories for RZGW Organizational Units in Krakow

Delivery of tools, power tools, and combustion engine tools with accessories: for the Regional Water Management Board in Krakow and its subordinate units, to the delivery locations specified in the Description of the Subject of the Order (Appendix No. 1 to the SWZ).

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:August 31, 2026

Maintenance of watercourses in the Pszczyna Water Supervision Area

Maintenance of watercourses: includes the care of the Branicki watercourse from km 1+950 to 8+480 in the localities of Brzeźce, Kryry, Suszec, Pszczyna municipality, Suszec, with a total length of 6.530 km.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:August 04, 2026

Supply of construction materials, building chemicals, and floor coverings for RZGW Gdańsk

Supply of construction materials, metal articles, and building chemicals. The detailed scope of services is specified in Annex 1 of the tender documents, contract terms in Annex 6. Delivery period is up to 21 days from contract signing.

Państwowe Gospodarstwo Wodne Wody Polskie

·Warszawa
Deadline:September 02, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now