Skip to main content
Activebkms-ef-25601030-1

Construction of a median crossover and renovation of BW 0a

Road construction for a median crossover and the renovation of structure 0a in the area of the Bayerisches Vogtland motorway interchange and the Hof Nord junction on both carriageways of the BAB A72 between approx. operational km 0.00 and 0+301.

CONTRACTING AUTHORITY

Name

Die Autobahn GmbH des Bundes - NL Nordbayern

City

im Bereich der BAB A9/ A72 des Autobahndreiecks Bayerisches Vogtland und Anschlussstelle Hof Nord auf beiden Richtungsfahrbahnen der BAB A72 zwischen ca. Betr.-km 0,00 und 0+301.

Country

DE

CLASSIFICATION

Procedure Type

de-open

Contract Type

Works

Main CPV

45233110, Motorway construction works.

ADDITIONAL DETAILS

Legal Basis

de-vob

DEADLINES & TIMELINE

Submission Deadline

14 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

14 days remaining

Similar Tenders

Explore CPV 45

Faunistic Mappings for Autobahn GmbH

The subject of the tender is faunistic mapping in the course of the planned widening of the carriageway and hard shoulder as well as the fundamental renewal of the federal motorway A7 between the Feuchtwangen West and Fichtenau junctions. The services include extensive surveys of various species groups such as breeding birds, bats, amphibians, reptiles, fish, butterflies, dragonflies, xylobiont beetles, molluscs and crustaceans. This is a pure service in the field of environmental and landscape planning for the preparation of construction measures. The main trade is entirely focused on faunistic surveys and ecological expert opinion preparation.

Die Autobahn GmbH des Bundes - NL Nordbayern

·Nürnberg
Deadline:August 17, 2026

Road maintenance for the BAB 73

Road maintenance for the BAB 73: Renewal of the surface and binder course (ACD+ACB) and partial replacement of the asphalt base course (ACT) over approximately 5.5 km for both directions, executed in 3 traffic and construction phases. This includes milling an ACD+ACB layer made of stone mastic asphalt and an ACT layer, wedge milling of the ACT in areas of cross-slope changes, removal and new construction of slot drains in the expansion area. The ACT and the surface courses ACD+ACB are to be constructed using stone mastic asphalt across the entire width and length, including all marking works using cold plastic compounds with aggregates or cold spray plastic.

Die Autobahn GmbH des Bundes - NL Nordbayern

·Nürnberg
Deadline:August 18, 2026

Conversion of Vehicle Restraint Systems

Removal and new installation of steel vehicle restraint systems (Eco-Safe, SUPER-RAIL Eco, SUPER-RAIL Eco doppelt, SUPER-RAIL VZB, and SUPER-RAIL Eco BW) over approximately 5.5 km for 2 directions of travel in 3 phases (pre-phase, main phase, and post-phase). Selective installation of restraint systems occurs on bridges, retaining walls, or strip foundations. The pre-phase involves opening median crossovers. The main phase includes the removal of existing vehicle restraint systems at the outer edge and in the median (both strands); the installation of new vehicle restraint systems in the median and at the outer edge; a further removal of existing systems at the outer edge; and the installation of new systems in the median and at the road edge. These works are carried out parallel to the works of the main contractor for the route. The post-phase involves closing remaining median crossovers.

Die Autobahn GmbH des Bundes - NL Nordbayern

·Nürnberg
Deadline:August 18, 2026

Traffic Safety for Bridge Renovation at Structure 0a

The tender comprises traffic safety works for the fundamental renewal G1 on the federal motorway A72 east of the Bayerisches Vogtland motorway triangle to east of the Hof-Nord junction, as well as for the renovation of structure BW 0a and the construction of a median crossing (MÜ). The main services include setting up a mobile traffic jam warning system, the assembly and provision of transportable protective barriers (containment level H1, working width W4) over a length of 860 m, and the application of temporary yellow longitudinal markings Type II (foil, profiled) with a total length of approximately 2,410 m. The main trade is traffic safety at construction sites.

Die Autobahn GmbH des Bundes - NL Nordbayern

·A9/ A72 Autobahndreieck Byerisches Vogtland
Deadline:July 30, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now