Construction of a training hall in Cheb
Construction of a training hall: Reinforced concrete foundations including piles and retaining walls; galvanized steel frame structure for the hall and vestibule; balcony as a concrete slab on steel structure and columns; grating staircase; sectional, insulated gates with electric drive; aluminum doors; exterior cladding on a concrete threshold with insulation, made of light sheet metal-mineral wool-sheet metal panels; roof also made of sheet metal-mineral wool-sheet metal panels; vestibule roof with a low slope and flat roof foil; installations include fire water piping, gas piping for heating units, electricity for lighting, sockets, and sports equipment; fire water connection in the corridor of the existing hall near the elevator; new gas pipeline from the main gas shut-off valve (HUP) along the existing route to reduce pressure losses; gas meter and connection of the existing gas boiler at the current location; electricity connection in the switchgear of the existing hall; heating and ventilation provided by four heating and ventilation units (Sahary) each with 29.8 kW; air extraction by a fan with 8,000 m³/h and ducting.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 537364-2026HTML
- TED PDF — 537364-2026PDF
- TED XML — 537364-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.