Construction of a Drilling Site for Geothermal Drilling
Turnkey construction of a geothermal drilling site: comprises three areas. The inner drilling site area includes foundations for the deep drilling rig, including drill cellars, serves as a setup area for all rig components (energy supply, storage of drilling fluid materials, emergency diesel, drill pipes), and is subject to AwSV requirements (material quality, drainage facilities, refueling areas). The outer area provides access and continuous circumvention of the inner area as a traffic route, including heavy oil transport. Outside the outer area are container and storage spaces, as well as storage basins for thermal water pump tests. Includes necessary ancillary facilities such as fencing.
CONTRACTING AUTHORITY
Name
GeoEnergieMünchenOst GmbH & Co. KG
City
Vaterstetten
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Works
Main CPV
45254100, Construction work for mining.
Other CPV
45214310, Vocational college construction work.
ADDITIONAL DETAILS
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
27 days remaining(LOT-0001)
Published