Construction of new generation units with heat accumulator for Zawidawie CHP plant
Notice title: Budowa nowych jednostek wytwórczych wraz z akumulatorem ciepła w EC Zawidawie
Construction of new generation units with a heat accumulator for the Zawidawie CHP plant as a turnkey project: design, supply, construction, assembly, integration into the existing technological system, commissioning, and handover of a boiler house with electrically powered boilers (e.g., electrode or resistance boilers) with a total power of at least 10 MWt and an efficiency of at least 97%; a cylindrical steel heat accumulator with a net usable volume of at least 2,000 m³; a cogeneration unit (AK4) with 4.5 MWe (delivery of AK4 not included); a fire water tank; the modification of the connection point for the existing cogeneration units AK1, AK2, AK3; and the associated BoP infrastructure. The power supply for the new generation units considers the different available reception capacities of the SN TAURON 3 and SN TAURON 4 connections; operation of the EKW at maximum power will require support from the cogeneration units' own generation.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0000RESTRICTED-DOCUMENT
- TED HTML — 616143-2026HTML
- TED PDF — 616143-2026PDF
- TED XML — 616143-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.