Construction of new generation units with heat accumulator for Zawidawie CHP plant
Turnkey construction of new generation units and associated systems: boiler house with electrically powered boilers (e.g., electrode, resistance boilers) with a total output of at least 10 MWt and an efficiency of at least 97%, where the power supply must consider the connection capacities of SN TAURON 3 and SN TAURON 4, and EKW operation at maximum power will be supported by the own generation of the CHP units; a cylindrical steel heat accumulator with a net usable volume of at least 2,000 m³; a cogeneration unit (AK4) with 4.5 MWe (delivery of AK4 not included); a fire water tank; the relocation of the connection point for existing cogeneration units AK1, AK2, AK3; and associated BoP infrastructure.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0000RESTRICTED-DOCUMENT
- TED HTML — 506026-2026HTML
- TED PDF — 506026-2026PDF
- TED XML — 506026-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.