Construction of new generation units with heat accumulator for Zawidawie CHP plant
Construction of new generation units with heat accumulator for Zawidawie CHP plant as a turnkey project: design, supply, construction, assembly, integration into the existing technological system, commissioning, start-up, and handover for operation of a boiler house with electrically powered boilers (e.g., electrode or resistance boilers) with a total power of at least 10 MWt and an efficiency of at least 97%; a cylindrical steel heat accumulator with a net usable capacity of at least 2,000 m³; a cogeneration unit (AK4) with 4.5 MWe (delivery of AK4 not included); a fire water tank; modification of the connection point for existing cogeneration units AK1, AK2, AK3; and associated BoP infrastructure. The power supply for the new generation units considers varying power consumption from SN TAURON 3 and SN TAURON 4, with maximum electric boiler power supported by the cogeneration units' own generation.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0000RESTRICTED-DOCUMENT
- TED HTML — 559985-2026HTML
- TED PDF — 559985-2026PDF
- TED XML — 559985-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.