Construction and operational technical upgrade for Bürgerwaldtunnel and Heidenäckertunnel on the A98
Construction and operational technical upgrade of the Bürgerwaldtunnel and Heidenäckertunnel on the A98: mining excavation for rescue tunnels (18,200 m³), shotcrete (4,000 m³), reinforced concrete (1,300 m³), reinforcing steel (250 t), nailing (3,200 m), anchors (13,000 m); additionally operational technical equipment including reinforced concrete (60 m³), reinforcing steel (5 t), cable laying (220,000 m), cable trench (1,700 m³), cable protection pipes (5,000 m).
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45221241, Road tunnel construction work.
LOTS (2)
Bautechnische Nachrüstung für Bürgerwaldtunnel und Heidenäckertunnel
Betriebstechnische Nachrüstung für Bürgerwaldtunnel und Heidenäckertunnel
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
102 days remaining(LOT-0001)