Construction of water supply and sewage networks in Poznań, Kalinowa, Opolska, 28 Czerwca 1956 r. streets
Construction of water supply and sewage networks in Poznań, Kalinowa, Opolska, and 28 Czerwca 1956 r. streets: Construction of a water supply pipeline with DN80 (10.96 m), DN100 (323.07 m), and DN150 (433.13 m), total length 767.16 m; dismantling of a water supply pipeline with DN40 (51.3 m), DN100 (255 m), DN150 (478 m), and DN180 (4.5 m); removal of pipelines (17.78 m); deactivation of the water supply network (435.17 m); 43 water connections; construction of a sanitary sewage pipeline DN200 (212 m); 14 sewage connections. The detailed scope of services is Appendix No. 8 of the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 581614-2026HTML
- TED PDF — 581614-2026PDF
- TED XML — 581614-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.