Construction Works for D1 Turany - Hubová Motorway
Construction works for the D1 Turany – Hubová motorway section: Total length 13.53 km, including the Korbeľka and Havran tunnels. The section features ten permanent bridge structures, four directly on the motorway and two as ecoducts. Additionally, a temporary steel modular bridge over the Váh river is planned for temporary access during construction. 3 retaining walls and 2 abutment walls will be built. Utility lines, including water pipelines, gas pipelines, high-voltage power lines (VVN, VN, NN), and long-distance and local telecommunication lines, will be relocated or protected. A Švošov Management and Maintenance Centre will be constructed near the Hubová junction, accessible via a new bridge over the Váh river. The exact scope is detailed in Volumes 1 to 5 of the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 572106-2026HTML
- TED PDF — 572106-2026PDF
- TED XML — 572106-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.