Construction Works for Forest Fire Protection Infrastructure in Forestry
Construction works for forest fire protection infrastructure as part of the project "Comprehensive project for the adaptation of forests and forestry to climate change – prevention, counteraction, and reduction of the effects of forest fire threats (PPOŻ2)": Reconstruction of a fire protection reservoir, construction of an artificial fire protection reservoir with a hardened maneuvering area (20 m x 20 m), and renovation of a fire protection tower. Services include compliance with health and safety, fire protection, and theft prevention regulations, assuming the duties of a health and safety coordinator, maintaining and clearing the construction site, keeping a construction log, setting up the construction site at own expense, and concluding a liability insurance contract. The detailed scope of work is described in the technical documentation (Annex 12 of the SWZ).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 586894-2026HTML
- TED PDF — 586894-2026PDF
- TED XML — 586894-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Lots (3)
- LOT-0001Umbau eines Brandschutzbeckens in der Försterei Kobylnica
- LOT-0002Bau eines Brandschutzbeckens mit Rangierplatz in der Försterei Łapajówka
- LOT-0003Sanierung eines Brandschutzturms in der Försterei Korzenica