Construction works for Ronda Este Ourense, Bemposta - N-525 section
Construction of a new bypass road (Ronda Este) connecting roads OU-105 and OU-525/N-525 in the municipalities of Ourense and San Cibrao das Viñas: The new route starts at the existing roundabout at P.Q. 2+580 of road OU-105 in Bemposta, runs southwest, and ends at a new connection roundabout to N-525/OU-525 and the A-52 motorway. The new road runs on an embankment for the first 400 m, then in a cutting with high slopes up to P.Q. 1+220, influenced by the ADIF railway line. At this point, the route crosses the Barbaña river via an 80 m viaduct and directly connects to the existing roundabout on the N-525. Access to this roundabout from/to N-525/OU-525 is redefined by the construction of two ramps: Ramal Sur starts from road OU-525 with a deceleration lane, and Ramal Norte starts from the existing roundabout, descends to N-525, and connects to the additional lane providing access to Expourense.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 504991-2026HTML
- TED PDF — 504991-2026PDF
- TED XML — 504991-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.