Construction works for flood protection measures on the Corund stream near Praid
Construction works and design for flood protection measures on the Corund stream near Praid: Construction of a non-permanent accumulation (1 unit, Vmax=6,149,319 m³) and regulation of the Corund stream (L=3,760 m), including execution of works and technical assistance from the designer. Estimated value for execution: 39,661,964.58 Lei without VAT, execution duration: 18 months. Design and execution of the diversion of the Corund stream and its tributaries (L=3,290 m). Design includes the technical project, specifications, execution details, field studies, and technical documentation for the construction permit. Execution involves site preparation, environmental protection measures, relocation/protection of utilities, provision of utilities, basic investment, site organization, technological tests, and handover. Estimated value for design and execution: 153,995,320.30 Lei without VAT. Design duration: 3 months, approval period: 1 month, execution duration: 30 months. Total execution duration: 34 months. Total estimated value of works: 193,657,284.87 Lei without VAT.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 550018-2026HTML
- TED PDF — 550018-2026PDF
- TED XML — 550018-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.