Site setup: 170m construction fence, 1 site toilet, construction doors (various sizes), temporary opening closures (various sizes), mobile working scaffolds (work inside the building above 3.5m), construction dryer, construction sign. Demolition works: approximately 137m² floors, approximately 118m² sub-concrete, removal of main pipes, dismantling of clean-off mats, approximately 300m² damaged plaster, removal of 6 plastic windows, demolition of drywall enclosures, glued insulation panels, fiber cement facade panels, approximately 110m² ceiling plaster, removal of approximately 75m² concrete block paving/slabs, demolition of approximately 30m² concrete surface, dismantling, temporary storage, adjustment, and reassembly of fence panels, removal of approximately 27m splash guard strips. Scaffolding works: approximately 1,194m² working scaffold, approximately 396m consoles, approximately 170m internal side protection, approximately 35m lattice girders, approximately 2 stair towers. Earthworks inside the building: approximately 13m³ excavation, approximately 65m² compaction of excavation pit, approximately 6.5m³ backfill. Drainage channel works inside the building: approximately 38m trench excavation, main pipes, trench backfill, leak test. Masonry works: closing 11 solid wall openings including patching, enlarging or creating 19 wall openings. Concrete and reinforced concrete works: creation of approximately 132m² sub-concrete inside the building. Plinth renovation, exterior of the building: approximately 344m³ excavation, approximately 145m² subgrade of excavation pit, approximately 324m³ backfill, approximately 139m splash guard strips, removal of approximately 224m² plinth plaster, cleaning masonry, clearing loose joints, salt treatment, sealing filler, approximately 120m horizontal waterproofing, approximately 224m² leveling/base waterproofing and vertical waterproofing (PMBC), approximately 162m² backfill protection membrane with finishing strip. Plinth renovation, interior of the building: removal of approximately 90m² floor edge areas, removal of approximately 282m² plinth plaster, cleaning masonry, clearing loose joints, salt treatment, sealing filler, approximately 71m horizontal waterproofing, approximately 152m² leveling/base waterproofing and vertical waterproofing (PMBC). Interior plastering works: masking of approximately 223m² windows and doors, leveling of approximately 200m² wall plaster surfaces, re-closing of approximately 110m² wall plaster surfaces, application of approximately 190m² cement-lime plaster to walls, leveling of approximately 175m² ceiling plaster, application of approximately 110m² ceiling plaster. Screed works: creation of approximately 107m² screed including waterproofing on concrete floor, creation of 4 clean-off mats. Facade works: masking of approximately 223m² windows and doors, cleaning of approximately 710m² facade surface (including plinth), creation of approximately 230m² perimeter insulation (XPS) for the plinth, creation of approximately 495m² ETICS (mineral wool) for the facade, creation of approximately 762m² surface reinforcement, approximately 267m² plinth plaster, approximately 495m² facade plaster (mineral light plaster KR).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 547933-2026HTML
- TED PDF — 547933-2026PDF
- TED XML — 547933-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.