Excavation Backfilling for New Waste Station Consolidation Building
Earth backfilling for a new building consolidating waste stations: backfilling at the shell construction, pipe backfilling, creation of provisional gravel roads and escape routes. Includes approx. 900 m² subgrade, approx. 150 m³ soil installation, approx. 800 m³ soil delivery and installation, approx. 15 m³ sand backfilling for pipes, approx. 110 m³ gravel base layer, and approx. 50 m² asphalt surfaces. Gross floor area (GFA) 3,650.00 m², gross volume (GV) 26,850.00 m³.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45112000, Excavating and earthmoving work.
Other CPV
45112100, Trench-digging work.
45112400, Excavating work.
45112500, Earthmoving work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
29 days remaining(LOT-0001)
Published