Construction Management and Supervision for Theodor-Heuss-Brücke Security Measure
Construction management and supervision for construction lots 1 "Cantilever Arm Reinforcement" and 2 "Railing Height Increase" on the Theodor-Heuss-Brücke: Reinforced concrete ribbed slabs on the cantilever arms of the main bridge are to be replaced by orthotropic steel plates; existing railings on the approach bridges are to be increased to 1.30 m. Additionally, supervision of factory and production assembly for steel construction is required.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0000RESTRICTED-DOCUMENT
- TED HTML — 556603-2026HTML
- TED PDF — 556603-2026PDF
- TED XML — 556603-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.