Skip to main content
Activeted-535359-2026

Construction Roads for Valley Bridge in Hundshaupten Wildlife Park

Development of field and forest paths into construction roads for the construction of a valley bridge in Hundshaupten Wildlife Park: Construction road abutment South approx. 1,100 m length, construction road abutment North approx. 1,630 m length, path width including verges approx. 5.0 m. Structure: Binderless wearing course 5 cm, sub-base layer 0/56 50 cm.

CONTRACTING AUTHORITY

Name

LRA Forchheim

City

Forchheim

Country

DE

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45000000, Construction work.

Other CPV

45233000, Construction, foundation and surface works for highways, roads.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

allowed

Legal Basis

32014L0024

15 days remaining

Similar Tenders

Explore CPV 45
€75M

Construction Works for Nuppulinna-Jokela RU2 and Hyvinkää-Riihimäki Pre-loadings

Construction works for the Nuppulinna-Jokela RU2 section and Hyvinkää-Riihimäki pre-loadings: complete construction works for the Nuppulinna-Jokela section, excluding internal safety device works, works specified as not part of the contract in the tender documents, and already completed structures. For the Hyvinkää-Riihimäki section, works include pre-loading structures, counter-embankments, maintenance and private road arrangements, catenary foundations, and catenary works. The contract comprises earthworks, substructure and superstructure works, catenary, heavy current, and lighting works, external safety device works, road and street construction works, structural works, and noise protection structures. Conditional construction works linked to funding decisions from Tuusula municipality, Tuusula Water, and Senaatti Properties are also included; funding will be confirmed during the tender phase at the latest. Optional works are included for the Jokela-Hyvinkää (km 49+620 - 59+000) and Hyvinkää-Riihimäki (km 59+000 - 68+140) sections, covering pre-loading structures, counter-embankments, excavation, culvert extensions, underpasses, road, street, and maintenance roads and their modifications, cable routes, embankments, catenary foundations, cable and line relocations and protections, environmental protection measures, and works not included in the Jokela station western side contract. Options can be called off during the contract period in one or more parts, based on unit prices from the contractor's tender or at cost price.

Väylävirasto

·FI1B1
Deadline:August 17, 2026
€160,000

Paving Works 2026

Paving works: Unit price total contract for the Municipality of Janakkala.

Janakkalan kunta

·FI1C2
Deadline:August 10, 2026
0

Main Ditch Excavation Works for Land Consolidation in Nivala-Haapaperä and Karvoskylä

Main ditch excavation works for land consolidation in Nivala-Haapaperä and Karvoskylä: includes work, materials, and aggregate. The main drainage works are divided into the Haapaperä division area (channels 1-9ab) with 10,021 m of ditches and the Karvoskylä division area (channels 10-15) with 6,496 m of ditches.

Maveplan Oy

·FI1D9
Deadline:August 03, 2026

Road Construction for Land Consolidation Nivala Haapaperä and Karvoskylä

Road construction for land consolidation in Nivala Haapaperä and Karvoskylä: includes labor, materials, and delivery of crushed stone.

Maveplan Oy

·FI1D9
Deadline:August 03, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now