Bridge Replacement Construction on BAB A3
Replacement construction of an underpass structure in a restrained reinforced concrete frame design as a skewed structure: demolition of the existing structure; earthworks including approx. 4,300 m³ excavation, approx. 3,000 m³ structural backfill, and approx. 690 m³ earthworks for embankments; installation and removal of approx. 2,100 m² steel sheet piling; installation of approx. 565 m injection anchors; concrete works including formwork for approx. 1,600 m³ concrete and approx. 227 t reinforcing steel; installation of an approx. 107 m ground pipe; road construction with gravel sub-base and asphalt on approx. 180 m²; pavement waterproofing with approx. 440 m² bituminous membrane and approx. 395 m² asphalt protective layer.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 559145-2026HTML
- TED PDF — 559145-2026PDF
- TED XML — 559145-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.