Ceiling lifts for new construction Centre Hospitalier de Luxembourg
Delivery and installation of ceiling tracks and ceiling lifts for the new construction of the Centre Hospitalier de Luxembourg: 24 ceiling tracks with a rail traversable across the patient area and an infusion holder; 2 patient lift systems for U/B room / transfer lock as 1-bed heavy-duty room; 53 patient lifts for 1-bed standard rooms (general care); 2 patient lift systems extending over the toilet for 1-bed heavy-duty rooms (general care); 45 patient lift systems with infusion ceiling track for 1-bed standard rooms (intensive care); 2 patient lift systems with infusion ceiling track including infusion pole for 1-bed heavy-duty rooms (intensive care); 1 patient lift system with infusion ceiling track including infusion pole for 2-bed heavy-duty rooms (intensive care); 2 patient lift systems extending over CT / parking position (CT/CT emergency); 20 mobile patient lifts. Services include the installation of substructures, the installation of ceiling lifts, the adjustment of stops in the swivel range with users/representatives, and the delivery of accessories immediately before commissioning. One main and one rework appointment are included in the offer price. The possible start of installation is October 4, 2027, with the latest completion of installations on March 29, 2029. Additional services include participation in collision checks by the coordinating architect and the provision of a knowledgeable employee for organizational meetings.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 581688-2026HTML
- TED PDF — 581688-2026PDF
- TED XML — 581688-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.