Electrical Installation for Renovation and Conversion of Blaustein Town Hall

Electrical installation: Renovation and conversion of Blaustein Town Hall, Marktplatz 2, 89134 Blaustein. Plot size 5,881 m², gross floor area (BGF) approx. 5,500 m², gross volume (BRI) approx. 23,460 m³, net floor area (NGF) approx. 4,870 m². Finished floor level ground floor (FFB EG) approx. 493.09 m above sea level, building height from ground approx. 14.37 m. The building includes 1 basement, ground floor, and 2 upper floors.

CONTRACTING AUTHORITY

Name

Stadt Blaustein

City

Blaustein

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45311200, Electrical fitting work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

16 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

16 days remaining

Similar Tenders

Explore CPV 45

Passenger Elevator for Town Hall Renovation

Supply and installation of a passenger elevator with through-loading function for the renovation and refurbishment of the Blaustein Town Hall. The service includes the operational assembly of an elevator system for 13 persons or a minimum load capacity of 1000 kg over 6 stops in a building-provided timber shaft frame. The main trade is elevator construction, which dominates the entire project.

Stadt Blaustein

·Blaustein
Deadline:August 06, 2026

Timber Construction Services for New Building

Timber construction services in the new building area above the 1st floor reinforced concrete slab: Walls as timber panel walls (prefabricated parts), ceilings as CLT ceiling construction, partly with ribs. Cladding of the timber panel walls with gypsum fiber boards inside and outside. Ceilings rest on columns and beams made of laminated veneer lumber or glulam. Consideration of static specifications from released position plans of the execution statics, as well as integrated own factory and assembly planning into the execution planning. Thermal insulation and sound insulation requirements are to be considered. Areas for temporary site setup and and use as intermediate storage for accumulating material are available; water, electricity, and sewage connections are provided through a separate award for central site facilities. Main services for the 2nd to 4th floor include factory and assembly planning as well as cutting planning for all timber components; manufacturing, delivery, and assembly of timber panel walls including cladding; manufacturing, delivery, and assembly of columns, main and secondary beams made of laminated veneer lumber or glulam; manufacturing, delivery, and assembly of CLT ceilings with and without ribs including re-anchoring to reinforced concrete components.

ringberlin Halle 2 Projektgesellschaft GmbH

·Berlin
Deadline:August 26, 2026

Successive Maintenance Work on Electrical Installations

Maintenance work on electrical installations: successive execution.

Institut »Jožef Stefan«

·Ljubljana
Deadline:August 27, 2026

Modernization of the Irrigation System at Villadangos Canal (León), Phase II

Construction works for the modernization of the irrigation system at Villadangos Canal (León), Phase II: Execution according to the approved implementation project dated June 12, 2026, including pipeline construction, irrigation works, and reservoir construction.

Sociedad Mercantil Estatal de Infraestructuras Agrarias, S.A. (SEIASA)

·Madrid
Deadline:August 24, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now