Electrical installation works for the renovation of Wing B of Carl-Kellner-Schule
Electrical installation works: 6 distribution boards, 2 construction power distributors, approx. 18,600 m of power and low-voltage cabling, approx. 860 m of power and low-voltage cabling for measurement, control, and regulation technology, installation systems, approx. 750 switches, sockets, and junction boxes, fire protection measures, motor control units for the expansion of the existing sun protection control unit, approx. 320 luminaires, approx. 77 emergency exit luminaires and emergency lighting (single battery), 3 IT server cabinets (2x 42 RU, 1x 21 RU), approx. 130 IT connection sockets, approx. 5,500 m of Cat7 Duplex data cable.
CONTRACTING AUTHORITY
Name
Kreisausschuss des Lahn-Dill-Kreises 12.4 Zentrale Vergabe- und Submissionsstelle
City
Wetzlar
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45311000, Electrical wiring and fitting work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
19 days remaining(LOT-0000)
Published