Electrical Engineering for Construction Phase 3.2
Electrical installation and assembly works for five locations: For pumping station Sand I, this includes 1 local grid/pump control power distribution (UB = 400 V), 1 slide gate and level cabinet (UB = 400 V), level measurements, electrical installation, 1 emergency power supply (UB = 400 V), electrical connection and cabling of control cabinets, electrical consumers (slide gate drives) and high-water pumps, potential equalization, planning, documentation, risk assessment, CE conformity declaration, commissioning, initial operation, and operator instruction. For pumping station Sand II, this includes 1 local grid/slide gate and level cabinet power distribution (UB = 400 V), electrical installation, 1 emergency power supply (UB = 400 V), electrical connection and cabling of control cabinets and electrical consumers (slide gate drives), a device for connecting mobile high-water pumps, potential equalization, planning, documentation, risk assessment, CE conformity declaration, commissioning, initial operation, and operator instruction. For sluice Asham, this includes 1 local grid power distribution (UB = 400 V), 1 slide gate and level cabinet (UB = 400 V), electrical installation, 1 emergency power supply (UB = 400 V), electrical connection and cabling of control cabinets and electrical consumers (slide gate drives), potential equalization, planning, documentation, risk assessment, CE conformity declaration, commissioning, initial operation, and operator instruction. For pumping station Asham, this includes 1 local grid/slide gate and level cabinet power distribution (UB = 400 V), electrical installation, 1 emergency power supply (UB = 400 V), electrical connection and cabling of control cabinets and electrical consumers (slide gate drives), a device for connecting mobile high-water pumps, potential equalization, planning, documentation, risk assessment, CE conformity declaration, commissioning, initial operation, and operator instruction. For pumping station Hunderdorf, this includes 1 local grid power distribution (UB = 400 V), electrical installation, 1 emergency power supply (UB = 400 V), electrical connection and cabling of control cabinets, a device for connecting mobile high-water pumps, potential equalization, planning, documentation, risk assessment, CE conformity declaration, commissioning, initial operation, and operator instruction.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 558525-2026HTML
- TED PDF — 558525-2026PDF
- TED XML — 558525-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.