Electrical Engineering and Power Supply for New Construction of Langenfelde Depot
Installation of power supply for the new construction of a service building with bus control center at the Langenfelde bus depot: establishment of a medium voltage system (1 pc air-insulated switchgear), two transformers (2 pcs dry-type transformers), two low voltage main distribution boards (2 pcs NSHV, thereof 1 pc AV and 1 pc SV), an emergency power system (1 pc), and two UPS systems (2 pcs), supplemented by a battery system (1 pc). This also includes approx. 100 m² raised floor for all power supply rooms, as well as cable and wiring systems, including medium voltage cabling, low voltage cabling, and potential equalization for the power supply systems.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 524425-2026HTML
- TED PDF — 524425-2026PDF
- TED XML — 524425-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.