Low-voltage electrical engineering for Heart Center tunnel connection House 60a
Renewal of low-voltage electrical engineering for the expansion of the connecting corridor between House 10 and the Heart Center (House 61). These works are part of the new construction and are scheduled for completion by the end of 2026.
CONTRACTING AUTHORITY
Name
Universitätsklinikum Magdeburg A.ö.R.
City
Magdeburg
Country
DE
CLASSIFICATION
Procedure Type
de-open
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
43000000, Machinery for mining, quarrying, construction equipment.
44000000, Construction structures and materials; auxiliary products to construction (excepts electric apparatus).
71000000, Architectural, construction, engineering and inspection services.
ADDITIONAL DETAILS
Legal Basis
de-vob
DEADLINES & TIMELINE
Submission Deadline
23 days remaining(LOT-0000)
Published