Skip to main content
Activeted-471751-2026

Energy Storage System for MFA De Kei

Delivery, installation, and maintenance of an Energy Storage System (EOS) for the Multifunctional Accommodation De Kei: The system is intended to cover energy consumption exceeding the existing small business connection of approx. 55 kW (3 x 80A), with an additional requirement of approx. 33 kW to be supplied by the EOS, for an expected total power delivery of approx. 88 kW. An energy content of 550 kWh and a 150 kW inverter are expected. The EOS also stores surplus energy from 68 PV panels for night use. Maximum noise production is <67 dB per unit at 1 meter distance, or 70 dB for multiple units at the EOS setup location. The system must be containerized and not exceed the space indicated in attachment 10. Maintenance is included for 2 years after installation. The EOS is to be used until 2031 and then reused at other municipal locations, ensuring the facility's operation until at least 2034. further items as per the tender documents.

CONTRACTING AUTHORITY

Name

Bizob

City

Oirschot

Country

NL

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Supplies

Main CPV

31422000, Battery packs.

Other CPV

31440000, Batteries.

31682510, Emergency power systems.

65400000, Other sources of energy supplies and distribution.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

allowed

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

45 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now