Energy Storage System for MFA De Kei
Delivery, installation, and maintenance of an Energy Storage System (EOS) for the Multifunctional Accommodation De Kei: The system is intended to cover energy consumption exceeding the existing small business connection of approx. 55 kW (3 x 80A), with an additional requirement of approx. 33 kW to be supplied by the EOS, for an expected total power delivery of approx. 88 kW. An energy content of 550 kWh and a 150 kW inverter are expected. The EOS also stores surplus energy from 68 PV panels for night use. Maximum noise production is <67 dB per unit at 1 meter distance, or 70 dB for multiple units at the EOS setup location. The system must be containerized and not exceed the space indicated in attachment 10. Maintenance is included for 2 years after installation. The EOS is to be used until 2031 and then reused at other municipal locations, ensuring the facility's operation until at least 2034. further items as per the tender documents.
CONTRACTING AUTHORITY
Name
Bizob
City
Oirschot
Country
NL
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Supplies
Main CPV
31422000, Battery packs.
Other CPV
31440000, Batteries.
31682510, Emergency power systems.
65400000, Other sources of energy supplies and distribution.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
45 days remaining(LOT-0000)
Published