Earthworks and Structural Shell Construction for the Hünxe School Center Expansion
Earthworks and structural shell construction for the expansion of the Hünxe school center: approx. 1,765 m³ excavation backfills, approx. 3,168 m³ soil excavation, approx. 1,134 m³ backfilling, approx. 2,159 m² sub-bases. Concrete and reinforced concrete works include approx. 268 m³ floor slabs, approx. 98 m³ strip foundations, approx. 108 m³ individual foundations, approx. 999 m³ ceiling slabs, approx. 425 m³ in-situ concrete walls, approx. 269 m² precast concrete walls WU, approx. 30 m² precast concrete walls, approx. 149 m³ beams/lintels, approx. 24 m³ columns, 10 units precast stair flights, approx. 7.20 m³ in-situ concrete stairs. Masonry works comprise approx. 349 m² masonry walls 11.5 cm, approx. 66 m² masonry walls 17.5 cm, approx. 195 m² masonry walls 24 cm. Reinforcement and built-in parts include approx. 70 tons reinforcing mesh BSt 500 M, approx. 230 tons reinforcing bar BSt 500 S, 125 units dowel strips, 864 units anchor connections MW steel. This also includes other site-related activities and participation in weekly construction meetings.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 515914-2026HTML
- TED PDF — 515914-2026PDF
- TED XML — 515914-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.