Earthworks, Concrete, and Sealing Works for BKE Extension Building according to DIN 18 300, 18 331, 18 336
Shell construction works for the connection to the existing building (VE 21084-04): approx. 720 m³ excavation of building pit, approx. 690 m³ soil delivery and installation, approx. 200 m³ in-situ reinforced concrete, approx. 125 m² precast walls, various cast-in parts, cable installation shafts, approx. 100 m² insulation works, and approx. 350 m² sealing works with associated connections. Start of technical preparation and on-site works: 12.11.2026, end of service provision: 28.05.2027.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 528230-2026HTML
- TED PDF — 528230-2026PDF
- TED XML — 528230-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.