Earthworks for the construction of Digestion II at Aurich-Haxtum Wastewater Treatment Plant
Earthworks for the construction of Digestion II at Aurich-Haxtum Wastewater Treatment Plant: earthworks and excavation pits for Digester II, operations building, gas storage, and gas flare; dewatering and drainage for digester and operations building; wastewater channel for the operations building. Quantities: soil excavation 4,610 m³, soil utilization 3,830 m³, soil delivery 3,672 m³, soil backfill 4,452 m³, pipeline construction 296 m, manholes 11 pcs.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 545009-2026HTML
- TED PDF — 545009-2026PDF
- TED XML — 545009-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.