Renewal of 35-kV Switchgear: Primary and Secondary Components, Delivery and Installation
Renewal of primary and secondary components for existing 35-kV switchgear: Retrofit measures for the 35-kV switchgear at substations Mainzer Straße (UW 11), Rathaus (UW 12), and Hauptbahnhof (UW 13) to ensure the 750-V DC traction power supply. This includes the delivery and installation of components for the substations built in 1995, as existing protection and control technology components are discontinued and spare parts are no longer available. The conversion and renewal measures are described in service sections 1 to 3.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 591618-2026HTML
- TED PDF — 591618-2026PDF
- TED XML — 591618-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.