Replacement Renewal of Ursprung Long-Distance Pipeline, Construction Phase I
Replacement renewal of Ursprung long-distance pipeline, Construction Phase I: Rehabilitation of the old pipeline using the reduction method with PE 100 pipes over 3.2 km. A PE-HD 560 x 50.8 plastic pipe will be inserted into the existing DN 550 pipeline (diameter reduction to 448 mm); a PE-HD 450 x 40.9 plastic pipe will be inserted into the DN 450 pipeline (diameter reduction to 368 mm). Construction is scheduled to begin in 2026.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 575147-2026HTML
- TED PDF — 575147-2026PDF
- TED XML — 575147-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.