Replacement New Build of 1st Section of Left-Bank Approach Bridge, Bonn-North Rhine Bridge (A565)
Planning and construction services for the replacement new build of the 1st section of the left-bank approach bridge of the Bonn-North Rhine Bridge (A565): preliminary design/structural design, detailed design for traffic facilities and civil engineering, BIM planning, structural engineering, drainage planning (RiStWaG system), construction scheduling, environmental planning, and landscape conservation planning. This includes the construction of foundations, substructures, superstructures, a RiStWaG drainage system, and the connection to the existing main bridge and the federal motorway network.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 498083-2026HTML
- TED PDF — 498083-2026PDF
- TED XML — 498083-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.