Replacement Construction of Filter Hall for Wildpark Waterworks
Replacement construction of a filter hall for the Wildpark Waterworks: Replacement of the open filter system with a two-stage, closed filter system with increased treatment capacity. The new plant is designed for flow rates of Qh,max = 280 m³/h and Qh,mittel = 250 m³/h (5,500 m³/d over 22 h/d), with a prospective demand of up to 5,500 m³/d and a base load of approx. 4,800 m³/d. Implementation will occur during ongoing operation, ensuring the adjacent, existing closed filter system remains operational. Services include civil engineering and water treatment equipment.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 544548-2026HTML
- TED PDF — 544548-2026PDF
- TED XML — 544548-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Lots (2)
- LOT-0001Ingenieurbau für Ersatzneubau Filterhalle
- LOT-0002Verfahrenstechnik für Ersatzneubau Filterhalle