Upgrade of Mechanical Equipment for Storm Water Overflow Basin Mainz-Finthen
Supply and installation of mechanical equipment: 1 screen rake (1,500 l/s, hydraulic drive, explosion-proof), 2 screen rakes (2,000 l/s, hydraulic drive, explosion-proof), 1 throttle gate valve DN 600 V4A including dismantling of the old valve, 1 hydraulic power unit for 3 screen rakes including oil lines/hoses, 3 stop logs (W/H = 2.00/1.90 - 2.05 m), 3 drainage pumps (80 l/s, submersible pumps) including V4A piping and dismantling of old pumps, 4 V4A access ladders (2.01 to 3.68 m), 2 V4A fall protection devices for access ladders, 29.5 m² V4A gratings; additionally, dismantling work for railings, ladders, walkways, stairs, as well as engineering services, workshop drawings, inspections, and a maintenance contract.
CONTRACTING AUTHORITY
Name
Wirtschaftsbetrieb Mainz AöR
City
Mainz
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45350000, Mechanical installations.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
15 days remaining(LOT-0001)
Published