Extended Shell Construction for New Fire Department Control Center
Extended shell construction for new fire department control center and sewer rehabilitation: New functional building with approx. 1,720 m³ earthworks, approx. 66 large-diameter bored piles, approx. 1,615 m³ reinforced concrete, approx. 600 t reinforcing steel, approx. 22 precast stair flights, approx. 980 m² sand-lime brick masonry, approx. 285 m basic pipelines, approx. 2,770 m earthing system, approx. 1,620 m² interior plaster, and approx. 120 m³ concrete demolition of existing structures. Sewer rehabilitation with approx. 500 m³ excavation, approx. 250 m³ backfilling of pipelines, approx. 100 m² timber infill for soldier pile walls, approx. 180 m² breaking up road concrete, approx. 115 m² concrete slab and asphalt concrete wearing course, approx. 48 m precast frame profile, approx. 8 m precast elements as bends, short pieces, with emergency drainage, approx. 260 m² concrete base layer of unreinforced concrete, approx. 240 m² bitumen waterproofing for reinforced concrete slab and joints, and approx. 1 unit DN 1200 manhole.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 555450-2026HTML
- TED PDF — 555450-2026PDF
- TED XML — 555450-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.