Specialized Planning for Electrical Engineering Equipment for Happing Primary School Extension and Renovation
Specialized planning for electrical engineering systems, plant groups 4 and 5: service phases 1-8 and special services according to §§53ff HOAI 2021. The project includes an extension to the existing Happing Primary School, the new construction of a two-field sports hall, and the renovation and refurbishment of the existing basement south (conversion of after-school care rooms into classrooms). Support for the demolition of the existing sports hall from the 1970s (without basement) is required due to a technical interconnection between the hall and the school building. As part of the planning, a concept for electrical separation must be developed to avoid disrupting ongoing school operations.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 548159-2026HTML
- TED PDF — 548159-2026PDF
- TED XML — 548159-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.