Technical Equipment Planning for New Secure Detention Facility, Tonna Correctional Facility
Technical equipment planning for the construction of a new secure detention facility at Tonna Correctional Facility: includes wastewater, water, and gas systems (KGr 410), heating systems (KGr 420), ventilation systems (KGr 430), user-specific systems (KGr 470), and other measures (KGr 490). The planning services according to § 53 HOAI cover service phases 2 to 8 (service levels 1 to 4). The procedure is a negotiated procedure with a call for competition; the exact scope of planning is detailed in the task description "0837-26 Aufgabenstellung.pdf".
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 580883-2026HTML
- TED PDF — 580883-2026PDF
- TED XML — 580883-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.