Skip to main content
Activebkms-ef-25609424-1

Fine Milling of UHS using the Twister Method in Hattingen

Fine milling of UHS using the Twister method: Execution of works in Hattingen.

CONTRACTING AUTHORITY

Name

Landesbetrieb Straßenbau NRW - Regionalniederlassung Südwestfalen

City

Hattingen

Country

DE

CLASSIFICATION

Procedure Type

de-open

Contract Type

Works

Main CPV

45233140, Roadworks.

Other CPV

45000000, Construction work.

ADDITIONAL DETAILS

Legal Basis

de-vob

DEADLINES & TIMELINE

Submission Deadline

2 days remaining

(LOT-0000)

Published

Download tender documentsDemo required
2 days remaining

Similar Tenders

Explore CPV 45

Framework Agreement for Oil Spill Removal in Olpe District

Oil spill removal on traffic areas: Removal of contamination caused by oil, fuels, or other operating fluids, including proper disposal of resulting waste.

Landesbetrieb Straßenbau NRW - Regionalniederlassung Südwestfalen

·Netphen
Deadline:September 03, 2026

Framework Agreement for Oil Spill Removal in Siegen-Wittgenstein District and Siegen City

Oil spill removal on traffic areas: Removal of contamination caused by oil, fuels, or other operating fluids, including proper disposal of resulting waste.

Landesbetrieb Straßenbau NRW - Regionalniederlassung Südwestfalen

·Netphen
Deadline:September 03, 2026

B54 Olpe, Replacement Construction of Ronnewinkel Viaduct, Object Planning Traffic Facilities and Structural Engineering LPH 3-5, Geotechnical Report

Object planning, structural engineering, and geotechnical services for the demolition and replacement construction of the Ronnewinkel Viaduct and the bridge over the L512 along the B 54 in Olpe. This includes object planning for traffic facilities.

Landesbetrieb Straßenbau NRW - Regionalniederlassung Südwestfalen

·Netphen
Deadline:September 01, 2026

Expansion of B508 between Kreuztal-Ferndorf and Kreuztal-Kredenbach

Joint tender by Landesbetrieb Straßenbau NRW and Wasserverband Siegen-Wittgenstein for the expansion of the B508 on the open road between Kreuztal-Ferndorf and Kreuztal-Kredenbach (4th construction section). The construction measure includes road construction works for the expansion of the federal road and the new construction of a cycle path, as well as pipeline construction works for the new construction of the E1a drinking water transport pipeline (DN 700 GGG, approx. 310 m) using open trenching and pipe jacking (DN 1200 St, approx. 24 m) under the B508. In addition, a reinforced concrete measuring and control shaft will be erected and a decommissioned section of the TL E9 pipeline (DN 500 GGG, approx. 340 m) will be filled with grout. The project is dominated by road construction and pipeline construction works.

Landesbetrieb Straßenbau NRW - Regionalniederlassung Südwestfalen

·Kreuztal
Deadline:August 05, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now