Forestry Services for Reforestation
Preparatory work before planting: Reforestation areas will be ground and soil worked to enable two types of planting: full-area planting or enrichment by plots. The service includes two tasks: surface grinding and soil work. Surface grinding for full reforestation: mechanized in-line grinding, 2.5 m width, lines spaced 3 m apart, with a 0.5 m unground inter-row. Grinding is performed at ground level to reduce forest weeds, logging residues, and protruding stumps. The mulch remains on the surface. Prior staking/marking of each line is required. Environmentally sensitive areas and elements to be preserved must be protected. Access for machinery on load-bearing soil. For enrichment reforestation (50 plots per hectare): manual cleaning or mechanized grinding of marked plots, each 5 m x 5 m = 25 m², to remove forest weeds and logging residues. Prior staking/marking of each plot is required. Environmentally sensitive areas and elements to be preserved must be protected. Access to plots only via existing operational compartments. Soil work for full reforestation: two techniques, in lines spaced 3 m apart, with a plant spacing of 1.7 m within the line. Subsoiling/Ploughing: use of a winged subsoiling tooth (or equivalent) in lines, to a minimum depth of 40 cm (reducible for very stony soils) for soil decompaction and drainage. The subsoiling tooth is lifted every 20 to 25 meters. Staking/marking of each plot. Ploughing with a covercrop or similar tool is possible on certain areas. Pitting: preferred for short linear distances, thick mulch layer, or frequent obstacles. Creation of pits with a subsoiling tooth or equivalent tool and mechanical excavator (2.5 to 8 tonnes). The soil is worked without turning (closed, worked pits without extraction, without turning horizons, without bringing up stones) for decompaction and loosening, with an average volume of 60 cm wide, 60 cm long, and 60 cm deep. For enrichment reforestation by plots (50 per hectare): only pitting technique, 9 plants per plot, i.e., 450 plants per hectare. Creation of pits with a subsoiling tooth or equivalent tool and mechanical excavator (2.5 to 8 tonnes). The soil is worked without turning (closed, worked pits without extraction, without turning horizons, without bringing up stones) for decompaction and loosening, with an average volume of 60 cm wide, 60 cm long, and 60 cm deep.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 570216-2026HTML
- TED PDF — 570216-2026PDF
- TED XML — 570216-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Lots (16)
- LOT-0001Oberflächenhäckseln und Bodenbearbeitung für Zone A (66 Ha)
- LOT-0003Oberflächenhäckseln und Bodenbearbeitung für Zone C (83 Ha)
- LOT-0004Oberflächenhäckseln und Bodenbearbeitung für Zone D (101 Ha)
- LOT-0005Wildschutz für Zone A (16,892 km)
- LOT-0006Wildschutz für Zone B (8,822 km)
- LOT-0007Wildschutz für Zone C (21,484 km)
- LOT-0008Wildschutz für Zone D (19,427 km)
- LOT-0009Lieferung und Pflanzung von 98.700 Pflanzen für Zone A
- LOT-0010Lieferung und Pflanzung von 56.000 Pflanzen für Zone B
- LOT-0011Lieferung und Pflanzung von 116.700 Pflanzen für Zone C
- LOT-0012Lieferung und Pflanzung von 139.750 Pflanzen für Zone D
- LOT-0013Pflanzenpflege für Zone A (2 Durchgänge N+1 und N+3) (66 ha)
- LOT-0014Pflanzenpflege für Zone B (2 Durchgänge N+1 und N+3) (35 ha)
- LOT-0015Pflanzenpflege für Zone C (2 Durchgänge N+1 und N+3) (83 ha)
- LOT-0016Pflanzenpflege für Zone D (2 Durchgänge N+1 und N+3) (101 ha)
- LOT-0017Oberflächenhäckseln und Bodenbearbeitung für Zone B (35 Ha)