Outdoor facilities for the construction of a new school
Outdoor facilities: site setup and surveying (1 lump sum), earthworks (excavation, soil removal, backfilling) approx. 1,200 m³, topsoil works and terrain profiling approx. 700 m³, drainage pipes approx. 115 m, drainage channels approx. 60 m, concrete paving approx. 1,200 m², water-bound paths approx. 500 m², frost protection and base layers approx. 1,450 m², reinforcing steel approx. 800 kg, natural stone walls approx. 95 m², retaining walls (L-shaped blocks) approx. 155 m, staircases and block steps approx. 65 m, kerbstones and edgings approx. 420 m, fence systems approx. 265 m, gate systems 2 units, electrical conduit systems approx. 650 m, outdoor lighting approx. 55 units, bicycle stands approx. 10 units, bench approx. 28 m, house connection box (1 lump sum), tool shed approx. 25 m², tree plantings approx. 55 units, plants approx. 2,100 units.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 597488-2026HTML
- TED PDF — 597488-2026PDF
- TED XML — 597488-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.