Outdoor Facilities for Cooperative School
Demolition/Site clearance: approx. 3,490 m² topsoil removal, approx. 50 m pipeline, approx. 2 units shafts, approx. 245 m ball-stop fence demolition, approx. 2 units gate systems, approx. 2,400 m² asphalt paving demolition, 1 unit tree felling. Earthworks: approx. 2,845 m³ soil excavation for paved areas, approx. 1,902 m³ soil replacement under subgrade. Drainage: approx. 92 m drainage channel NW 100, approx. 4 units clean-off grates, approx. 200 m wastewater pipe PP DN/OD 160, approx. 2 units throttle shafts, approx. 30 units completion of shafts including manhole covers, approx. 1 unit rainwater retention, soakaway, V = 61 m³, approx. 1 unit rainwater retention, soakaway, V = 19 m³, approx. 2 units rainwater storage, V = 5 m³ supply and installation. Paved areas: approx. 1,680 m² concrete slabs, 40 x 60 x 12, approx. 585 m² concrete slabs, 30 x 30 x 8, approx. 55 m² grass pavers, approx. 1,875 m² EPDM surfacing, approx. 820 m concrete kerb, approx. 165 m elastic kerbstone, approx. 395 m³ base layers, approx. 875 m³ frost protection layer, approx. 160 m² fall protection wood chips, approx. 310 m² sand for volleyball court, approx. 45 m² sand for long jump facility supply and installation. Seating blocks: approx. 8 units concrete seating blocks, L = 200 cm. Fences and gates: approx. 1 unit three-wing gate system; approx. 150 m ball-stop fence, h=4m. Equipment: 1 unit rope pyramid, ground trampoline, shot put facility, 2 units multi-purpose goals, 4 units basketball hoops, 1 unit 2-room metal equipment shed, 1 unit table tennis table, 2 units starling nesting aids, 3 units custom-made seating elements. Landscaping: approx. 1,700 m³ topsoil supply and installation, approx. 2,310 m² lawn seeding with fine grading, approx. 340 m² meadow seeding (flowering meadow), approx. 7 units standard trees, approx. 180 units shrubs, approx. 84 m² perennial areas planting. Estimated duration: Completion of all construction services (excluding planting works and completion maintenance) by 02.08.2027; planting works by 30.11.2027; completion of maintenance by 30.11.2028.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 577085-2026HTML
- TED PDF — 577085-2026PDF
- TED XML — 577085-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.